PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Copper piping at the 2nd floor Facing North.jpg Curtain wall glass.jpg Installed conduit above the Search room 144 Facing South.jpg Layout for Stair -3 block work Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing South.jpg VAV Boxes at the 2nd floor.jpg Welding black iron duct work at the 4th floor Facing South.jpg
Previous pageNext page Started connecting the copper piping to the 3rd floor VAV boxes Facing North
Started connecting the copper piping to the 3rd floor VAV boxes Facing North